We use first and third-party cookies and other tracking technologies partner (Microsoft Clarity, Google Analytics, and Microsoft Advertising) to better undersand how you use and interact with our website. We use this information for site optimization, fraud/security purposes, and advertising. For more information, visit the Privacy Statement. Close

 

ARTICLE SUMMARY 

  • ERP and MES serve different purposes. ERP manages business plans and transactions, while MES manages the details of production as it happens. 
  • The standardization gap is not simply a missing software connection. It appears when systems disagree about identifiers, quantities, timing, or what a production status means. 
  • Poorly defined exchanges can create manual reconciliation, delayed reporting, weaker traceability, and integration work that grows with every new plant or system. 
  • ISA-95 offers a common framework for defining the boundary between business and manufacturing systems. Rain Engineering applies that thinking when connecting Proficy MES with ERP and plant-floor systems. 

An order leaves the ERP system marked ready for production. 

The plant:  

  1. receives it 
  1. runs the equipment 
  1. records the material used 
  1. checks quality  
  1. … and reports what was made 

That sounds like one continuous process. Yet the business and manufacturing systems involved may describe the same order in different ways, at different levels of detail, and at different times. 

The result is a gap that employees often bridge with spreadsheets, manual checks, and a great deal of patience. 

Today we take a closer look at why ERP and MES speak different languages, what that disconnect costs, and how manufacturers can build a more reliable conversation between them. 

Two Systems, Two Jobs 

Enterprise resource planning, or ERP, is concerned with the business of manufacturing. It helps an organization plan demand, manage purchasing and inventory, account for costs, and coordinate orders across the enterprise. A manufacturing execution system, or MES, is concerned with carrying out production. It provides the operational detail needed to understand what happened on the line, including production activity, quality results, material consumption, downtime, and traceability. 

That distinction matters because neither system is necessarily wrong when its view differs from the other’s. An ERP order may call for a finished quantity by a particular date. MES has to deal with the work required to produce that quantity: the equipment available, the materials actually consumed, the units accepted or rejected, and the time production began and ended. ERP needs a trustworthy business result. MES needs enough context to manage and record the work behind it. 

The International Society of Automation’s ISA-95 framework gives manufacturers a useful way to describe this boundary. It places manufacturing operations management, including MES, at Level 3 and business planning and logistics, including ERP, at Level 4. More importantly, it defines models and terminology for the information exchanged between those functions. Its purpose is not to make ERP behave like MES. It is to help the two communicate without losing the meaning of the data they share.  

That is where many integration projects become more complicated than expected. A network connection can deliver a message successfully while the receiving system still interprets it incorrectly. The order number may arrive, but the MES may need a product definition or a specific manufacturing route that the message does not clearly identify. A production quantity may return to ERP, but someone still has to determine whether it represents everything produced, only acceptable output, or a quantity after a particular inspection step. 

The language problem is therefore about more than field names. It is about definitions, ownership, and timing. What does “complete” mean? Which system owns a material identifier? When should a changed order become effective on the shop floor? Can a previously reported production result be corrected, and if so, how will both systems show that correction? Until a team agrees on those answers, even a technically successful interface can leave the business with two conflicting versions of production. 

Where the Translation Breaks Down 

Product and material identifiers are a common source of friction. ERP may organize an item around purchasing, inventory, or customer requirements, while MES must associate it with a process, line, recipe, or set of quality checks. The mapping between those records has to remain dependable as products and processes change. Otherwise, people must intervene to determine which shop-floor definition belongs to an enterprise order. 

The same issue appears in quantities and units of measure. A business system may plan and report in finished cases, while an operation records weight, individual units, or material consumed during production. The conversion may be straightforward mathematically, but the business meaning still needs to be specified. Accepted output, rejected output, and work that has not yet passed inspection should not be treated as interchangeable simply because each can be expressed as a number. 

Timing introduces another layer of complexity. ERP may revise an order after it has been released. MES may already have assigned work, started production, or captured material usage against the original instruction. If the integration does not define how revisions are handled, the plant can continue working from one set of instructions while the enterprise plans around another. Reliable synchronization requires rules for changes and exceptions, not just a schedule for transferring data. 

Status is especially vulnerable to misunderstanding. “Started,” “in process,” “produced,” “released,” and “closed” describe different operational or business milestones. A system should not infer one milestone from another without an agreed rule. Quality provides a clear reason why: completing a run does not, by itself, establish that its output has been accepted for the next business step. 

Traceability raises the stakes further. A useful production record connects materials, equipment, activity, and quality information in a way that can be understood later. If ERP and MES exchange only an order number and a final quantity, the business may receive a transaction without the operational context needed to answer questions about how that output was made. Sending every plant-floor data point to ERP is not the answer, either. The goal is to identify which information the enterprise actually needs and preserve a reliable path back to the detailed record. 

These are design decisions, not defects that a connector can solve on its own. ISA-95 addresses the interface between manufacturing and enterprise functions partly by defining the content and transactions involved in their exchanges. The standard provides a shared starting point; each manufacturer still has to decide how its own products, processes, and systems map to that model.  

The Cost of an Unclear Interface 

The most visible cost of the standardization gap is manual work. When order details, production results, or quality statuses do not line up, employees have to investigate. They compare screens, export data, correct records, and ask colleagues which number should be trusted. Each workaround may seem manageable on its own. Across shifts, product changes, and facilities, those workarounds become an unofficial integration system maintained by people. 

The less visible cost is decision-making based on information that arrives late or lacks context. Production may have finished, but the enterprise view may not reflect the accepted quantity yet. A scheduler may be waiting for an accurate status. A quality team may have the answer in MES while a business team sees only an incomplete transaction in ERP. The delay is not always caused by slow software. Sometimes nobody has agreed on exactly when a result is ready to cross the boundary. 

There is also a maintenance cost. A custom field mapping built for one site may not fit the next site’s equipment or product structure. An interface that works for current workflows may break when a business rule, application, or reporting requirement changes. If the meaning of each exchange lives only in code or in one specialist’s memory, every change becomes harder to evaluate. Standardization helps by making the underlying definitions and responsibilities explicit, even when a manufacturer still needs site-specific configuration. 

ISA describes reducing the risk, cost, and errors of enterprise-to-manufacturing interfaces as a goal of ISA-95. The National Institute of Standards and Technology also identifies integration among operational technologies, analytical tools, and decision-support systems as a challenge for smart manufacturing. Neither source supplies a universal dollar figure for an individual plant’s ERP-MES gap. The practical cost depends on how often mismatches occur, how much effort they take to resolve, and which decisions rely on the affected data. 

That makes measurement important. A manufacturer can examine the time spent reconciling orders and production totals, the number of transactions requiring correction, the lag between a shop-floor event and its enterprise update, and the effort needed to reproduce an interface at another facility. Those measures turn a vague complaint that “the systems do not talk” into specific requirements for improving how they talk. 

A Common Language for Real Operations 

Closing the gap starts by defining the exchange before choosing how to transport it. Teams need to agree on the business event that sends an order to MES, the information required to execute it, and the production results that must return to ERP. They also need named owners for identifiers, definitions, and corrections. Without that groundwork, faster messages can simply move ambiguous data faster. 

ISA-95 is useful here because it offers a technology-independent framework rather than prescribing one software product or one interface design. It helps business and operations teams discuss the Level 3 and Level 4 boundary using common terms. MESA International’s B2MML provides XML schemas based on ISA-95 models that organizations may use when integrating enterprise and manufacturing systems. The existence of a standard format does not eliminate the need to agree on local business rules, but it can provide a more consistent structure for exchanging information. 

An effective project also makes exceptions part of the design. What happens if an order changes after production starts? How is a rejected result reported? What should users see when one system accepts a transaction and the other does not? How can a team identify and replay a failed exchange without creating a duplicate? These questions are less exciting than a successful demonstration, but they determine whether the integration remains trustworthy during everyday operations. 

Manufacturers should also resist treating every site variation as either a failure of standardization or a reason to abandon it. A shared model can define the common order, production, quality, and traceability information needed across an enterprise. Individual plants may still require configuration for their actual processes. The important distinction is whether a variation reflects a real operational requirement or simply an undocumented difference that has accumulated over time. 

A Rain Engineering partner story published by Velotic (formerly GE Vernova) shows what this can look like in practice. It describes work for a global chemical manufacturer implementing Proficy Smart Factory and Proficy Scheduler across a network of more than 100 sites, with the solution deployed at multiple facilities to date. In the described implementation, orders download automatically from ERP into Proficy; production is managed in Proficy Smart Factory; and quality and traceability information returns to enterprise systems. The story also identifies scheduling and Certificate of Analysis generation among the capabilities supported. It does not claim that all 100-plus sites have been deployed or publish a savings figure, so neither claim should be assumed.  

The lesson from that documented work is not that every plant needs the same configuration. It is that a consistent architecture can give a multi-site program a foundation while allowing the implementation to address differences among manufacturing environments. When orders, execution records, and results have defined paths between systems, teams can spend less effort interpreting disconnected records and more effort using the information. 

The Wrap Up 

ERP and MES speak different languages because they answer different questions. 

ERP asks what the business needs to plan, fulfill, and account for; MES asks what was required to make the product and what actually happened. 

The gap becomes costly when neither side has a dependable definition of the information crossing between them. 

Clear ownership, agreed meanings, well-designed exception handling, and a shared framework such as ISA-95 can make that exchange more reliable. 

In the end, the goal is not to erase the difference between business and production… It is to make that difference understandable every time an order moves to the plant and a production result comes back. 


FAQ 

  • Does ISA-95 make ERP and MES automatically compatible? No. It provides common models and terminology for integration, but teams must still map their data, define business rules, and implement and test the exchanges.  
  • Should ERP receive every piece of shop-floor data? Not necessarily. The integration should deliver the information needed for business decisions while maintaining access to the detailed operational record in the appropriate system. 
  • Is this only a problem for manufacturers with multiple plants? No. One facility can encounter mismatched identifiers, quantities, and statuses. Multiple plants can make those differences harder to manage consistently. 
  • Where should an ERP-MES integration effort begin? Start with a specific production workflow and document the orders, changes, results, and exceptions that cross between systems. That reveals the definitions that need agreement before interface work begins. 

P.S. At Rain Engineering, we help manufacturers connect Proficy Smart Factory MES with ERP, SCADA, and shop-floor systems. 

Our MES implementation approach starts by assessing the systems and mapping integration requirements, then carries those connections through deployment and support. 

If your team is spending too much time translating between the production plan and the production record, that boundary is a practical place to start.


Don Rahrig Avatar


More about this author   LinkedIn

Subscribe to Smart Factory Insights

Subscribe to Smart Factory Insights for topical blog posts,
timely industry news, and MES best practices –
keeping you in the conversation so you can do better.

* indicates required

<< Back to Blog Home