Overall Equipment Effectiveness (OEE) Calculator v2.5

Equipment / Area
Date
Full Window Time
Total duration of the given time period
hours
Non-Operating Time
Equipment is not in use nor expected to be (No schedule, weekend, off-shift, preventative maintenance, etc.)
hours
Ideal Cycle Unit of Time:
Restrained Time
Downtime due to upstream and downstream issues
hours
Ideal Cycle Rate
highest possible # of cycles that can run in the unit of time selected
cycles per hour
Operating Downtime
Downtime due to major failures and interruptions
hours
Ideal Operating Cycle Count
0 cycles
Performance Downtime
Downtime due to microstops and operations challenges
hours
Operating Cycle Count:
actual # of cycles completed
Total Uptime
12 hours
Quality Cycle Loss:
# of cycles that failed quality inspection
Operating Time
Total Uptime + Performance Downtime
13 hours
95% OEE
(Availability * Performance * Quality)
95%
Availability
95%
Performance
95%
Quality

Availability

Full Window Time
24 hours
Non-Operating Time
Scheduled downtime for maintenance, time off, or no orders
8 hours
Calendar Operating Time
16 hours
Restrained Time
Downtime due to upstream and downstream issues
2 hours
Available Operating Time
14 hours
Operating Downtime
Downtime due to major failures and interruptions
1 hours
Operating Time
13 hours
Performance Downtime
Downtime due to microstops and operations challenges
1 hours
Total Downtime
10 hours
Total Uptime
12 hours
Availability
(Operating Time /
Available Operating Time)
95%

Performance

% Close to Ideal Cycle Rate
Running Cycle Rate / Ideal Cycle Rate
50
Operating Time
Time running after removing all logged downtime (except Performance)
13 hours
Production Stats
Ideal Operating Cycle Count
0 cycles
Ideal Cycle Rate
0 cycles per hour
Operating Cycle Count
0 cycles total
Operating Cycle Rate
0 cycles per hour
Performance Cycle Loss
Cycles not completed due to running slow and minor delays
0 cycles total
Performance Time Penalty
0 hours
( Performance Time Loss
0 hours +
Performance Downtime
0 hours )
Net Operating Time
10 hours
Performance
(Net Operating Time
/ Operating Time)

95%

Quality

Chance of Defects
This is the % chance of a cycle failing quality inspection.
50
Net Operating Time
Equivalent of time running cycles at full speed during Operating Time
(Operating Time – Operating Time Loss)
10 hours
Production Stats
Operating Cycle Count
???? cycles
Quality Cycle Loss
Cycles that failed quality inspection
0 cycles
Quality Time Loss
0 hours
Quality Cycle Count
0 cycles
True Operating Time
Equivalent of time running at full speed during Operating Time, perfectly
18.2 hours
Quality
(True Operating Time
/ Net Operating Time)
95%
95% OEE
(Availability * Performance * Quality)


95%
Availability
95%
Performance
95%
Quality